Engineering Procedures

From Seasons 4 Wiki
Revision as of 20:36, 20 January 2020 by Timm (talk | contribs)

Return to Engineering Main Menu

This page lists the Seasons-4 engineering procedures.

 

Under-construction.png

 

 

ENGINEERING PROCEDURES

 

ADMINISTRATION---INDEX

 

  1. ENGINEERING UNIT MASTER FILE
  2. SUBMITTAL POLICY
  3. PRODUCTION PACKAGE POLICY
  4. GENERIC VERSUS SPECIFIC PARTS
  5. UNIT MODEL NUMBERS
  6. ASSIGNING NUMBERS TO PARTS PROVIDED BY OTHERS
  7. CREATING NEW SUBBILLS
  8. AUTO CAD UNIT DIMENSIONAL DRAWINGS
  9. DESIGNING UNITS USING SECTIONS
  10. SUPERMARKET UNIT DESIGNATION
  11. NOTIFICATION REQUIRED WHEN CHANGING PARTS
  12. DRAWING FILE NAMING AND SAVING PROTOCOL
  13. SEQUENCE OF OPERATION
  14. NEW CONDENSER AND SUB COOLING COIL
  15. PIPING SCHEMATIC DRAWINGS
  16. ENGINEERING BULLETIN
  17. CURB DRAWING FOR SUBMITTAL
  18. OMS MANUALS
  19. DIMENSIONAL DATA DRAWING STANDARDS
  20. MASTER QUOTES
  21. FILTERS SHIPPED SEPARATELY
  22. ENGINEERING FILE NAMING PROCEDURE
  23. ENGINEERING REVIEW OF UNITS IN PRODUCTION
  24. PEER UNIT DESIGN REVIEW
  25. FACTORY ORDERS FOR ITEMS OTHER THAN UNITS

 

BLOWERS---INDEX

 

  1. BELT REQUIREMENTS, SMALL HP DRIVES
  2. CENTER DISTANCE, HORIZONTAL PLENUM FANS
  3. SELECTION OF BLOWER CLASS
  4. APPLICATION OF FORWARD CURVE BLOWERS
  5. APPLICATION OF TWIN PLENUM BLOWERS
  6. VIBRATION ISOLATION OF BLOWERS
  7. GUIDELINES FOR DIRECT DRIVE BLOWERS MANUFACTURED BY SEASONS-4
  8. BLOWER INLET GUARDS
  9. PLENUM BLOWERS WITH MOTOR MOUNTED ON TOP

 

 

CABINET—INDEX

 

  1. CONTROL PANEL CONSTRUCTION, NON-VESTIBULE
  2. 2-PIECE CABINET CONSTRUCTION
  3. O.A. INTAKES
  4. REMOTE TERMINAL ACCESS
  5. SPECIAL CONSIDERATIONS FOR UNITS OVER 138" WIDE
  6. DOOR INDICATORS FOR SUBMITTAL DRAWINGS
  7. NON-MOTORIZED RES EXHAUST DAMPERS
  8. LOCATION OF OA DAMPER, VESTIBULE UNITS
  9. LOCATION & STORAGE OF DIMENSIONAL DATA DRAWINGS
  10. UNIT HEIGHT
  11. UNIT WIDTH
  12. DUAL DUCT UNITS
  13. FILTER SPACE REQUIREMENTS
  14. PERFORATED LINERS
  15. INSTALLATION GUIDELINES FOR VARIABLE FREQUENCY DRIVES
  16. VENTILATION REQUIREMENTS FOR COMPRESSORS

 

CONTROLS---INDEX

 

  1. FREEZESTAT
  2. AIRFLOW SWITCH
  3. SMOKE DETECTOR
  4. EES & RES DUAL DUCT OPERATION
  5. RELAYS
  6. HIGH STATIC PRESSURE LIMIT SWITCH
  7. SEQUENCE OF OPERATION FOR SMOKE DETECTORS

 

DUCT FURNACES---INDEX

 

  1. POWER VENTED FURNACE REQUIREMENTS
  2. MODINE FURNACE POLICY
  3. GAS CONNECTION SIZES
  4. BURNER LOCATION IN CABINET
  5. TUBULAR FURNACE ORIENTATION

 

 

ELECTRICAL---INDEX

 

  1. MAIN DISCONNECT LOCK-OUTS
  2. THROUGH-THE-DOOR DISCONNECT & TOGGLE
  3. MOTOR MANUFACTURER BY VOLTAGE
  4. PUMP OVERLOAD SIZING
  5. FREEZESTAT, AMBIENT COOLING& HEATING LOCK-OUTS
  6. NEUTRAL BAR
  7. CONDENSER FAN FUSING
  8. BRANCH CIRCUITS-ELECTRIC HEAT
  9. ENCAPSULATED TRANSFORMERS
  10. INVERTER DUTY CONDENSER FAN MOTORS
  11. PIERCING CONNECTORS
  12. UNIT LIGHTING
  13. UL508A CONTROL PANELS
  14. COMPRESSOR PUMP DOWN FOR WATER COOLED SYSTEMS
  15. NEMA CONTACTOR SIZING FOR COMPRESSORS

 

ELECTRIC HEAT---INDEX

 

  1. APPLICATION OF ELECTRIC HEATERS

 

 

EVAPORATORS---INDEX

 

  1. DRAIN PAN INSULATION
  2. SIZE GUIDELINES
  3. BYPASS DAMPER LOCATION
  4. MODEL NUMBER TONNAGE CALCULATION
  5. DISTRIBUTOR NOZZLE ORDERING
  6. EVAPORATOR HEADER SIZING
  7. DISTRIBUTOR/NOZZLE SELECTION

 

HEAT RECLAIM---INDEX

 

  1. SIZING HEAT RECLAIM COILS

 

 

MOTORS---INDEX

 

  1. MAXIMUM LOADING/MOTOR HP SELECTION
  2. MOTOR MANUFACTURER SELECTION

 

 

MULTI-ZONE EQUIPMENT---INDEX

 

  1. ZONE LABELING
  2. HOT DECK VS. COLD DECK PRESSURE DROP
  3. TWO DECK VAV AND TRIPLE DECK DAMPERS

 

 

PIPING---INDEX

 

  1. SPLIT SYSTEMS
  2. ANGLE VALVE CALLOUTS
  3. REFRIGERANT LINE SIZES
  4. LIQUID LINE SENSOR MOUNTING LOCATION
  5. LOW AMBIENT CONTROL
  6. WATER PIPING

 

POWER BURNERS---INDEX

 

  1. HIGH TURNDOWN BURNERS
  2. ADIABATIC CHAMBER SIZES
  3. CGA POWER BURNER REQUIREMENTS
  4. DECK FOR PIPING PURPOSES
  5. GAS CONNECTION SIZES
  6. BURNER LOCATION IN CABINET
  7. ORDERING PROCEDURE FOR POWERFLAME BURNERS

 

UNIT DESIGN---INDEX

 

  1. HOT GAS REHEAT COILS
  2. SUPERMARKET DESIGN GUIDELINES
  3. ENERGY RECOVERY DESIGN GUIDELINES (SUBMITTAL PROGRAM)
  4. FILTERS FOR MAKE-UP AIR UNITS

 

WATER AND STEAM COILS---INDEX

 

  1. PLACEMENT OF CW/HW/STEAM COILS
  2. STEAM COIL SELECTION GUIDELINES