Administration/012 Administration Drawing File Protocol.pdf

From Seasons 4 Wiki

Return to Procedures Main Menu

Index: Administration

Subject: (12) Drawing File Naming and Saving Protocol

Date: October 10, 2003

Revised November 5, 2009

Revised October 29, 2019

 

 

Drawing File Naming and Saving Protocol– Drawings should be named using the method provided shown below. The file name will always start with the factory order or preliminary design number shown in the PE schedule. For factory orders, each drawing will be savedin the FO ( J:) drive “Submittal Drawings” folder. For preliminaries, each drawing will be saved in the Prelim (M:) drive “Engineering” folder. All PDF copies of the drawing will be saved in the same folder as the AutoCAD drawing. The drawing names will no longer include the engineer’s initials. This has been a source of confusion, as several engineers may work on different aspects of the same project.

 

The original issue PDF will be saved with the same file name as the AutoCAD with “REV 0” added to the end (EX: C921D01 REV 0.pdf). As revisions are made to the drawing, the AutoCAD drawing name will remain the same, but we will continue to save the PDF files with the appropriate REV # to maintain a history of the drawing changes.

(Example: Factory order C921 has three identical custom units. Its dimensional drawing should be named C921D01and the file should be saved as J:\C900-C999\C921\Submittal Drawings\C921D01.dwg)

 

   

1

2

3

4

5

6

7

8

9

Factory Orders:

D

9

2

1

D

0

1

   

Preliminaries:

P

0

9

8

2

9

D

0

1

 

Factory Orders:                                   Preliminaries:

Digits 1 - 4: Factory Order Number       Digits 1 - 6: Preliminary Number

Dgiti 5: Drawing Description                  Digit 7: Drawing Description

Digits 6 - 7: Unit Designation                 Digits 8 - 9: Unit Designation

 

Drawing Description Types:

A  Airflow Diagram

C  Unit Curb Drawing

D  Unit Dimensional Data Drawing

M  Miscellaneous

P  Piping Schematic Diagram

Z  Zone Detail Drawing

 

Unit Designation: 01 for a single unit, or 1st unit drawing of multiple unit project

                               02,03,04, etc. for additional units as needed