Engineering Procedures: Difference between revisions
From Seasons 4 Wiki
mNo edit summary |
mNo edit summary |
||
| (3 intermediate revisions by the same user not shown) | |||
| Line 1: | Line 1: | ||
<p style="text-align: right;">Return to [[Engineering|Engineering Main Menu]]</p> |
<p style="text-align: right;">Return to [[Engineering|Engineering Main Menu]]</p> |
||
<span style="font-size:larger;">This page lists the Seasons-4 |
<span style="font-size:larger;">This page lists the Seasons-4 Engineering procedures.</span> |
||
|
|
||
| Line 7: | Line 7: | ||
|
|
||
<p style="text-align: center;">'''<span style="color:#e74c3c;"><span style="font-size:large;"><span style="background-color:#ffff00;">* * * * * IMPORTANT - These individual procedure pages have not been created or linked. * * * * *</span></span></span>'''</p> <p style="text-align: center;">'''<span style="color:#e74c3c;"><span style="font-size:large;"><span style="background-color:#ffff00;">Do NOT click any of the below procedures until further notice.</span></span></span>'''</p> <div class="WordSection1"><p align="center" class="MsoHeader" style="text-align:center"> </p> <p align="center" class="MsoHeader" style="text-align:center"><span style="tab-stops:.5in center 3.0in right 6.0in">'''<span style="font-size:16.0pt">ENGINEERING PROCEDURES</span>'''</span></p> <p align="center" class="MsoHeader" style="text-align:center"> </p> |
|||
|
|||
<div class="WordSection1"><p align="center" class="MsoHeader" style="text-align:center"><span style="tab-stops:.5in center 3.0in right 6.0in">'''<span style="font-size:16.0pt">ENGINEERING PROCEDURES</span>'''</span></p> <p align="center" class="MsoHeader" style="text-align:center"> </p> |
|||
<span style="tab-stops:.5in center 3.0in right 6.0in"><span style="font-size:12.0pt">[[Administration/000_Administration_Index.pdf|ADMINISTRATION---INDEX]]</span></span> |
<span style="tab-stops:.5in center 3.0in right 6.0in"><span style="font-size:12.0pt">[[Administration/000_Administration_Index.pdf|ADMINISTRATION---INDEX]]</span></span> |
||
| Line 221: | Line 219: | ||
|
|
||
#<span style="font-size:12.0pt">[[ |
#<span style="font-size:12.0pt">[[Hot_Gas_Reheat_Coils|HOT GAS REHEAT COILS]]</span> |
||
#<span style="font-size:12.0pt">[[Unit_Design/002_Unit_Design_Supermarket_Design_Guidelines.pdf|SUPERMARKET DESIGN GUIDELINES]]</span> |
#<span style="font-size:12.0pt">[[Unit_Design/002_Unit_Design_Supermarket_Design_Guidelines.pdf|SUPERMARKET DESIGN GUIDELINES]]</span> |
||
#<span style="font-size:12.0pt">[[Unit_Design/003_Unit_Design_Energy_Recovery_Submittal.pdf|ENERGY RECOVERY DESIGN GUIDELINES (SUBMITTAL PROGRAM)]]</span> |
#<span style="font-size:12.0pt">[[Unit_Design/003_Unit_Design_Energy_Recovery_Submittal.pdf|ENERGY RECOVERY DESIGN GUIDELINES (SUBMITTAL PROGRAM)]]</span> |
||
Latest revision as of 21:36, 22 January 2020
Return to Engineering Main Menu
This page lists the Seasons-4 Engineering procedures.
* * * * * IMPORTANT - These individual procedure pages have not been created or linked. * * * * *
Do NOT click any of the below procedures until further notice.
ENGINEERING PROCEDURES
- ENGINEERING UNIT MASTER FILE
- SUBMITTAL POLICY
- PRODUCTION PACKAGE POLICY
- GENERIC VERSUS SPECIFIC PARTS
- UNIT MODEL NUMBERS
- ASSIGNING NUMBERS TO PARTS PROVIDED BY OTHERS
- CREATING NEW SUBBILLS
- AUTO CAD UNIT DIMENSIONAL DRAWINGS
- DESIGNING UNITS USING SECTIONS
- SUPERMARKET UNIT DESIGNATION
- NOTIFICATION REQUIRED WHEN CHANGING PARTS
- DRAWING FILE NAMING AND SAVING PROTOCOL
- SEQUENCE OF OPERATION
- NEW CONDENSER AND SUB COOLING COIL
- PIPING SCHEMATIC DRAWINGS
- ENGINEERING BULLETIN
- CURB DRAWING FOR SUBMITTAL
- OMS MANUALS
- DIMENSIONAL DATA DRAWING STANDARDS
- MASTER QUOTES
- FILTERS SHIPPED SEPARATELY
- ENGINEERING FILE NAMING PROCEDURE
- ENGINEERING REVIEW OF UNITS IN PRODUCTION
- PEER UNIT DESIGN REVIEW
- FACTORY ORDERS FOR ITEMS OTHER THAN UNITS
- BELT REQUIREMENTS, SMALL HP DRIVES
- CENTER DISTANCE, HORIZONTAL PLENUM FANS
- SELECTION OF BLOWER CLASS
- APPLICATION OF FORWARD CURVE BLOWERS
- APPLICATION OF TWIN PLENUM BLOWERS
- VIBRATION ISOLATION OF BLOWERS
- GUIDELINES FOR DIRECT DRIVE BLOWERS MANUFACTURED BY SEASONS-4
- BLOWER INLET GUARDS
- PLENUM BLOWERS WITH MOTOR MOUNTED ON TOP
- CONTROL PANEL CONSTRUCTION, NON-VESTIBULE
- 2-PIECE CABINET CONSTRUCTION
- O.A. INTAKES
- REMOTE TERMINAL ACCESS
- SPECIAL CONSIDERATIONS FOR UNITS OVER 138" WIDE
- DOOR INDICATORS FOR SUBMITTAL DRAWINGS
- NON-MOTORIZED RES EXHAUST DAMPERS
- LOCATION OF OA DAMPER, VESTIBULE UNITS
LOCATION & STORAGE OF DIMENSIONAL DATA DRAWINGS- UNIT HEIGHT
- UNIT WIDTH
- DUAL DUCT UNITS
- FILTER SPACE REQUIREMENTS
- PERFORATED LINERS
- INSTALLATION GUIDELINES FOR VARIABLE FREQUENCY DRIVES
- VENTILATION REQUIREMENTS FOR COMPRESSORS
- FREEZESTAT
- AIRFLOW SWITCH
- SMOKE DETECTOR
- EES & RES DUAL DUCT OPERATION
- RELAYS
- HIGH STATIC PRESSURE LIMIT SWITCH
- SEQUENCE OF OPERATION FOR SMOKE DETECTORS
- POWER VENTED FURNACE REQUIREMENTS
- MODINE FURNACE POLICY
- GAS CONNECTION SIZES
- BURNER LOCATION IN CABINET
- TUBULAR FURNACE ORIENTATION
- MAIN DISCONNECT LOCK-OUTS
- THROUGH-THE-DOOR DISCONNECT & TOGGLE
- MOTOR MANUFACTURER BY VOLTAGE
- PUMP OVERLOAD SIZING
- FREEZESTAT, AMBIENT COOLING& HEATING LOCK-OUTS
- NEUTRAL BAR
- CONDENSER FAN FUSING
- BRANCH CIRCUITS-ELECTRIC HEAT
- ENCAPSULATED TRANSFORMERS
- INVERTER DUTY CONDENSER FAN MOTORS
- PIERCING CONNECTORS
- UNIT LIGHTING
- UL508A CONTROL PANELS
- COMPRESSOR PUMP DOWN FOR WATER COOLED SYSTEMS
- NEMA CONTACTOR SIZING FOR COMPRESSORS
- DRAIN PAN INSULATION
- SIZE GUIDELINES
- BYPASS DAMPER LOCATION
- MODEL NUMBER TONNAGE CALCULATION
- DISTRIBUTOR NOZZLE ORDERING
- EVAPORATOR HEADER SIZING
- DISTRIBUTOR/NOZZLE SELECTION
- SPLIT SYSTEMS
- ANGLE VALVE CALLOUTS
- REFRIGERANT LINE SIZES
- LIQUID LINE SENSOR MOUNTING LOCATION
- LOW AMBIENT CONTROL
- WATER PIPING
- HIGH TURNDOWN BURNERS
- ADIABATIC CHAMBER SIZES
- CGA POWER BURNER REQUIREMENTS
- DECK FOR PIPING PURPOSES
- GAS CONNECTION SIZES
- BURNER LOCATION IN CABINET
- ORDERING PROCEDURE FOR POWERFLAME BURNERS
- HOT GAS REHEAT COILS
- SUPERMARKET DESIGN GUIDELINES
- ENERGY RECOVERY DESIGN GUIDELINES (SUBMITTAL PROGRAM)
- FILTERS FOR MAKE-UP AIR UNITS