Cabinet/012 Cabinet Dual Duct Units.pdf

From Seasons 4 Wiki
Revision as of 15:54, 1 February 2021 by Gmoncus (talk | contribs) (created)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Return to Procedures Main Menu

Index: Cabinet

Subject: (12) Dual Duct Units

Date: August 30, 2005

 

When designing replacement dual duct units, the hot deck and cold deck location within the Seasons-4 replacement unit MUST match orientation of the existing unit as shown on the field measurement drawings. If the field measurement drawings do not indicate the orientation of the hot deck and cold deck, the project engineer MUST get clarification from Sales before proceeding with the design of the equipment.

For new dual duct units, the project engineer may determine the orientation of the hot deck and cold deck ONLY when Sales verifies that the consulting engineer will be working from our design. If the project has been designed using another manufacturer’s equipment, the project engineer MUST match the orientation of the basis of design. If it is unclear whether or not the configuration has been determined by the consulting engineer, the project engineer MUST get clarification from Sales before proceeding with the design of the equipment.