Main Page: Difference between revisions
From Seasons 4 Wiki
No edit summary |
(JUST GOOFING) |
||
| (5 intermediate revisions by 2 users not shown) | |||
| Line 1: | Line 1: | ||
Welcome to the Seasons 4 Wiki.<br> |
|||
This wiki houses the Seasons-4 engineering procedures. |
|||
<span style="font-size:x-large;"><u>'''Welcome to the Seasons-4 Wiki'''</u></span> |
|||
The procedures are as follows: |
|||
This wiki houses Seasons-4 department information. |
|||
ADMINISTRATION---INDEX |
|||
1. ENGINEERING UNIT MASTER FILE |
|||
2. SUBMITTAL POLICY |
|||
3. PRODUCTION PACKAGE POLICY |
|||
4. GENERIC VERSUS SPECIFIC PARTS |
|||
5. UNIT MODEL NUMBERS |
|||
6. ASSIGNING NUMBERS TO PARTS PROVIDED BY OTHERS |
|||
7. CREATING NEW SUBBILLS |
|||
8. AUTO CAD UNIT DIMENSIONAL DRAWINGS |
|||
9. DESIGNING UNITS USING SECTIONS |
|||
10. SUPERMARKET UNIT DESIGNATION |
|||
11. NOTIFICATION REQUIRED WHEN CHANGING PARTS |
|||
12. DRAWING FILE NAMING AND SAVING PROTOCOL |
|||
13. SEQUENCE OF OPERATION |
|||
14. NEW CONDENSER AND SUB COOLING COIL |
|||
15. PIPING SCHEMATIC DRAWINGS |
|||
16. ENGINEERING BULLETIN |
|||
17. CURB DRAWING FOR SUBMITTAL |
|||
18. OMS MANUALS |
|||
19. DIMENSIONAL DATA DRAWING STANDARDS |
|||
20. MASTER QUOTES |
|||
21. FILTERS SHIPPED SEPARATELY |
|||
22. ENGINEERING FILE NAMING PROCEDURE |
|||
23. ENGINEERING REVIEW OF UNITS IN PRODUCTION |
|||
24. PEER UNIT DESIGN REVIEW |
|||
25. FACTORY ORDERS FOR ITEMS OTHER THAN UNITS |
|||
BLOWERS---INDEX |
|||
1. BELT REQUIREMENTS, SMALL HP DRIVES |
|||
2. CENTER DISTANCE, HORIZONTAL PLENUM FANS |
|||
3. SELECTION OF BLOWER CLASS |
|||
4. APPLICATION OF FORWARD CURVE BLOWERS |
|||
5. APPLICATION OF TWIN PLENUM BLOWERS |
|||
6. VIBRATION ISOLATION OF BLOWERS |
|||
7. GUIDELINES FOR DIRECT DRIVE BLOWERS MANUFACTURED BY SEASONS-4 |
|||
8. BLOWER INLET GUARDS |
|||
9. PLENUM BLOWERS WITH MOTOR MOUNTED ON TOP |
|||
CABINET—INDEX |
|||
1. CONTROL PANEL CONSTRUCTION, NON-VESTIBULE |
|||
2. 2-PIECE CABINET CONSTRUCTION |
|||
3. O.A. INTAKES |
|||
4. REMOTE TERMINAL ACCESS |
|||
5. SPECIAL CONSIDERATIONS FOR UNITS OVER 138" WIDE |
|||
6. DOOR INDICATORS FOR SUBMITTAL DRAWINGS |
|||
7. NON-MOTORIZED RES EXHAUST DAMPERS |
|||
8. LOCATION OF OA DAMPER, VESTIBULE UNITS |
|||
9. LOCATION & STORAGE OF DIMENSIONAL DATA DRAWINGS |
|||
10. UNIT HEIGHT |
|||
11. UNIT WIDTH |
|||
12. DUAL DUCT UNITS |
|||
13. FILTER SPACE REQUIREMENTS |
|||
14. PERFORATED LINERS |
|||
15. INSTALLATION GUIDELINES FOR VARIABLE FREQUENCY DRIVES |
|||
16. VENTILATION REQUIREMENTS FOR COMPRESSORS |
|||
CONTROLS---INDEX |
|||
1. FREEZESTAT |
|||
2. AIRFLOW SWITCH |
|||
3. SMOKE DETECTOR |
|||
4. EES & RES DUAL DUCT OPERATION |
|||
5. RELAYS |
|||
6. HIGH STATIC PRESSURE LIMIT SWITCH |
|||
7. SEQUENCE OF OPERATION FOR SMOKE DETECTORS |
|||
DUCT FURNACES---INDEX |
|||
1. POWER VENTED FURNACE REQUIREMENTS |
|||
2. MODINE FURNACE POLICY |
|||
3. GAS CONNECTION SIZES |
|||
4. BURNER LOCATION IN CABINET |
|||
5. TUBULAR FURNACE ORIENTATION |
|||
The main departments are: |
|||
|
|||
ELECTRICAL---INDEX |
|||
<span style="font-size:large;">Accounting</span> |
|||
1. MAIN DISCONNECT LOCK-OUTS |
|||
2. THROUGH-THE-DOOR DISCONNECT & TOGGLE |
|||
<span style="font-size:large;">Custom Sales</span> |
|||
3. MOTOR MANUFACTURER BY VOLTAGE |
|||
4. PUMP OVERLOAD SIZING |
|||
<span style="font-size:large;">Drafting</span> |
|||
5. FREEZESTAT, AMBIENT COOLING & HEATING LOCK-OUTS |
|||
6. NEUTRAL BAR |
|||
<span style="font-size:large;">[[Engineering|Engineering]]</span> |
|||
7. CONDENSER FAN FUSING |
|||
8. BRANCH CIRCUITS-ELECTRIC HEAT |
|||
<span style="font-size:large;">Production</span> |
|||
9. ENCAPSULATED TRANSFORMERS |
|||
10. INVERTER DUTY CONDENSER FAN MOTORS |
|||
<span style="font-size:large;">Purchasing</span> |
|||
11. PIERCING CONNECTORS |
|||
12. UNIT LIGHTING |
|||
<span style="font-size:large;">Service</span> |
|||
13. UL508A CONTROL PANELS |
|||
14. COMPRESSOR PUMP DOWN FOR WATER COOLED SYSTEMS |
|||
<span style="font-size:large;">Supermarket Sales</span> |
|||
15. NEMA CONTACTOR SIZING FOR COMPRESSORS |
|||
LINK TO STANDARD COMPONENTS |
|||
ELECTRIC HEAT---INDEX |
|||
|
|||
1. APPLICATION OF ELECTRIC HEATERS |
|||
Thank you for visiting! |
|||
EVAPORATORS---INDEX |
|||
1. DRAIN PAN INSULATION |
|||
2. SIZE GUIDELINES |
|||
3. BYPASS DAMPER LOCATION |
|||
4. MODEL NUMBER TONNAGE CALCULATION |
|||
5. DISTRIBUTOR NOZZLE ORDERING |
|||
6. EVAPORATOR HEADER SIZING |
|||
7. DISTRIBUTOR/NOZZLE SELECTION |
|||
HEAT RECLAIM---INDEX |
|||
1. SIZING HEAT RECLAIM COILS |
|||
MOTORS---INDEX |
|||
1. MAXIMUM LOADING/MOTOR HP SELECTION |
|||
2. MOTOR MANUFACTURER SELECTION |
|||
MULTI-ZONE EQUIPMENT---INDEX |
|||
1. ZONE LABELING |
|||
2. HOT DECK VS. COLD DECK PRESSURE DROP |
|||
3. TWO DECK VAV AND TRIPLE DECK DAMPERS |
|||
PIPING---INDEX |
|||
1. SPLIT SYSTEMS |
|||
2. ANGLE VALVE CALLOUTS |
|||
3. REFRIGERANT LINE SIZES |
|||
4. LIQUID LINE SENSOR MOUNTING LOCATION |
|||
5. LOW AMBIENT CONTROL |
|||
6. WATER PIPING |
|||
POWER BURNERS---INDEX |
|||
1 HIGH TURNDOWN BURNERS |
|||
2 ADIABATIC CHAMBER SIZES |
|||
3 CGA POWER BURNER REQUIREMENTS |
|||
4 DECK FOR PIPING PURPOSES |
|||
5 GAS CONNECTION SIZES |
|||
6 BURNER LOCATION IN CABINET |
|||
7 ORDERING PROCEDURE FOR POWERFLAME BURNERS |
|||
UNIT DESIGN---INDEX |
|||
1. HOT GAS REHEAT COILS |
|||
2. SUPERMARKET DESIGN GUIDELINES |
|||
3. ENERGY RECOVERY DESIGN GUIDELINES (SUBMITTAL PROGRAM) |
|||
4. FILTERS FOR MAKE-UP AIR UNITS |
|||
WATER AND STEAM COILS---INDEX |
|||
1. PLACEMENT OF CW/HW/STEAM COILS |
|||
2. STEAM COIL SELECTION GUIDELINES |
|||
Latest revision as of 15:58, 3 February 2022
Welcome to the Seasons-4 Wiki
This wiki houses Seasons-4 department information.
The main departments are:
Accounting
Custom Sales
Drafting
Production
Purchasing
Service
Supermarket Sales
LINK TO STANDARD COMPONENTS
Thank you for visiting!