Administration/002 Administration Submittal Policy.pdf: Difference between revisions

From Seasons 4 Wiki
(added submittal policy to wiki)
 
(added return link)
 
Line 1: Line 1:
<p style="text-align: right;">Return to [[Engineering_Procedures|Procedures&nbsp;Main Menu]]</p>
<span style="tab-stops:.5in"><span style="font-size:12.0pt"><span style="font-family:">Index: Administration</span></span></span>


<span style="tab-stops:.5in"><span style="font-size:12.0pt"><span style="font-family:" garamond",serif"="">Index: Administration</span></span></span>
<span style="tab-stops:.5in"><span style="font-size:12.0pt"><span style="font-family:">Subject: (2) Submittal Policy</span></span></span>


<span style="tab-stops:.5in"><span style="font-size:12.0pt"><span style="font-family:" garamond",serif"="">Subject: (2) Submittal Policy</span></span></span>
<span style="tab-stops:.5in"><span style="font-size:12.0pt"><span style="font-family:">Date: August 31, 1998</span></span></span>


<span style="tab-stops:.5in"><span style="font-size:12.0pt"><span style="font-family:" garamond",serif"="">Date: August 31, 1998</span></span></span>
<span style="font-size:12.0pt"><span style="font-family:">''Revised June 1, 2018''</span></span>

<span style="font-size:12.0pt"><span style="font-family:" garamond",serif"="">''Revised June 1, 2018''</span></span>


&nbsp;
&nbsp;
Line 12: Line 12:
&nbsp;
&nbsp;


<span style="font-size:12.0pt"><span style="font-family:" garamond",serif"="">The project engineer will fill out the submittal checklist for each project based on the specific requirements for the project.</span></span>
<span style="font-size:12.0pt"><span style="font-family:">The project engineer will fill out the submittal checklist for each project based on the specific requirements for the project.</span></span>


&nbsp;
&nbsp;


<span style="font-size:12.0pt"><span style="font-family:" garamond",serif"="">Unless specifically requested otherwise, all submittals will include the following:</span></span>
<span style="font-size:12.0pt"><span style="font-family:">Unless specifically requested otherwise, all submittals will include the following:</span></span>


*<span style="font-size:12.0pt"><span style="font-family:" garamond",serif"="">Cover Sheet</span></span>
*<span style="font-size:12.0pt"><span style="font-family:">Cover Sheet</span></span>
*<span style="font-size:12.0pt"><span style="font-family:" garamond",serif"="">Start-up Request</span></span>
*<span style="font-size:12.0pt"><span style="font-family:">Start-up Request</span></span>
*<span style="font-size:12.0pt"><span style="font-family:" garamond",serif"="">General Equipment Specification</span></span>
*<span style="font-size:12.0pt"><span style="font-family:">General Equipment Specification</span></span>
*<span style="font-size:12.0pt"><span style="font-family:" garamond",serif"="">Engineering (Engineering Specifications or Schedule)</span></span>
*<span style="font-size:12.0pt"><span style="font-family:">Engineering (Engineering Specifications or Schedule)</span></span>
*<span style="font-size:12.0pt"><span style="font-family:" garamond",serif"="">Fan Curves</span></span>
*<span style="font-size:12.0pt"><span style="font-family:">Fan Curves</span></span>
*<span style="font-size:12.0pt"><span style="font-family:" garamond",serif"="">Dimensional Drawings</span></span>
*<span style="font-size:12.0pt"><span style="font-family:">Dimensional Drawings</span></span>
*<span style="font-size:12.0pt"><span style="font-family:" garamond",serif"="">Cabinet Construction Detail Drawings</span></span>
*<span style="font-size:12.0pt"><span style="font-family:">Cabinet Construction Detail Drawings</span></span>
*<span style="font-size:12.0pt"><span style="font-family:" garamond",serif"="">Unit Wiring Schematics (all Custom; upon request for Supermarket)</span></span>
*<span style="font-size:12.0pt"><span style="font-family:">Unit Wiring Schematics (all Custom; upon request for Supermarket)</span></span>
*<span style="font-size:12.0pt"><span style="font-family:" garamond",serif"="">Factory Order</span></span>
*<span style="font-size:12.0pt"><span style="font-family:">Factory Order</span></span>
*<span style="font-size:12.0pt"><span style="font-family:" garamond",serif"="">ETL Listing</span></span>
*<span style="font-size:12.0pt"><span style="font-family:">ETL Listing</span></span>
*<span style="font-size:12.0pt"><span style="font-family:" garamond",serif"="">Receiving and Installation Instructions</span></span>
*<span style="font-size:12.0pt"><span style="font-family:">Receiving and Installation Instructions</span></span>
*<span style="font-size:12.0pt"><span style="font-family:" garamond",serif"="">Seasons-4 Warranty</span></span>
*<span style="font-size:12.0pt"><span style="font-family:">Seasons-4 Warranty</span></span>


&nbsp;
&nbsp;


<span style="font-size:12.0pt"><span style="font-family:" garamond",serif"="">All submittals are assembled as a pdf file and emailed to the Sales Engineer assigned to the project as well as the Inside Sales Manager for the department (Supermarket or Custom).</span></span>
<span style="font-size:12.0pt"><span style="font-family:">All submittals are assembled as a pdf file and emailed to the Sales Engineer assigned to the project as well as the Inside Sales Manager for the department (Supermarket or Custom).</span></span>


<span style="font-size:12.0pt"><span style="font-family:" garamond",serif"="">No submittals will be sent via mail unless specifically requested by Sales.</span></span>
<span style="font-size:12.0pt"><span style="font-family:">No submittals will be sent via mail unless specifically requested by Sales.</span></span>

Latest revision as of 19:59, 29 January 2021

Return to Procedures Main Menu

Index: Administration

Subject: (2) Submittal Policy

Date: August 31, 1998

Revised June 1, 2018

 

 

The project engineer will fill out the submittal checklist for each project based on the specific requirements for the project.

 

Unless specifically requested otherwise, all submittals will include the following:

  • Cover Sheet
  • Start-up Request
  • General Equipment Specification
  • Engineering (Engineering Specifications or Schedule)
  • Fan Curves
  • Dimensional Drawings
  • Cabinet Construction Detail Drawings
  • Unit Wiring Schematics (all Custom; upon request for Supermarket)
  • Factory Order
  • ETL Listing
  • Receiving and Installation Instructions
  • Seasons-4 Warranty

 

All submittals are assembled as a pdf file and emailed to the Sales Engineer assigned to the project as well as the Inside Sales Manager for the department (Supermarket or Custom).

No submittals will be sent via mail unless specifically requested by Sales.